Subsea 7 acquires polymer lining company
Published by Anna Nicklin,
Assistant Editor
World Pipelines,
Subsea 7 S.A. has recently announced the acquisition of a leading polymer lining technologist in the subsea industry, Swagelining Limited. This acquisition will further expand Subsea 7’s existing polymer pipeline technology interests.
Subsea 7 and Swagelining Limited have co-operated as a successful partnership, designing and installing in excess of 150 km of reeled and bundled polyethylene (PE) lined water injection flowlines in the North Sea. This has been done for a number of operators and developments.
Thomas Sunde, Subsea 7’s Vice President of Technology, commented: “Building upon a long-term strategic objective to provide more cost-effective solutions, Subsea 7 and Swagelining have a shared vision of the potential that polymer lining could have in future subsea engineering and construction projects, with a focus on extending the application of polymer lined flowlines.”
He added: “The acquisition of Swagelining Limited will enable Subsea 7 to enhance its flowline and riser technology portfolios, and supports Subsea 7’s commitment to develop and apply technologies that reduce cost, enhance production and extend field life.”
Adapted from press release by Anna Nicklin
Read the article online at: https://www.worldpipelines.com/business-news/10082016/subsea-7-acquires-polymer-lining-company/
You might also like
World Pipelines Podcast: Going global with IPLOCA
In this episode, Elizabeth Corner speaks to Georges Hage, Executive Secretary at IPLOCA, about IPLOCA's insights on the culture and characteristics of the pipeline contractor community, and how it works to support sustainable energy infrastructure.
Construction begins on Greensand’s carbon dioxide transit terminal at Port Esbjerg
When the tanks are full, the liquefied carbon dioxide will be loaded onto a dedicated carrier from Royal Wagenborg and shipped to the INEOS Nini platform in the Danish North Sea. From there, it will be safely injected via pipeline into subsurface reservoirs approximately 1800 m beneath the seabed for permanent storage.