Deep Gulf Energy awards contract to Technip
Published by Louise Mulhall,
Editorial Assistant
World Pipelines,
Technip has been awarded a lump sum contract by Deep Gulf Energy III, LLC (DGE) for the development of the South Santa Cruz and Barataria fields. These ultra-deepwater fields are located in Mississippi Canyon, offshore New Orleans, in the Gulf of Mexico, in approximately 2000 m of water depth.
The contract consists of:
Covering all aspects of the field development from engineering to design, manufacturing and installation, this new award highlights Technip’s unique vertical integration in the subsea business environment.
Technip's operating centre in Houston, Texas, USA, will manage the overall project. The flowline system will be fabricated at the Group’s spoolbase in Mobile, Alabama, USA.
The offshore installation is expected to be performed in the second half of 2016 by Technip’s vessel the Deep Blue, the Group’s flagship vessel for deepwater pipelay.
Deanna Goodwin, President of Technip in North America commented:
“This contract award by DGE is a testament to their continued trust in Technip’s execution expertise and asset capabilities. I am pleased that this award comes in conjunction with the successful completion of the Kodiak project and with the recent award of the Odd Job project. This will allow us the opportunity to further strengthen the relationship with our client into 2016.”
Adapted from a press release by Louise Mulhall
Read the article online at: https://www.worldpipelines.com/business-news/09022016/deep-gulf-energy-awards-contract-to-technip/
You might also like
World Pipelines Podcast: Going global with IPLOCA
In this episode, Elizabeth Corner speaks to Georges Hage, Executive Secretary at IPLOCA, about IPLOCA's insights on the culture and characteristics of the pipeline contractor community, and how it works to support sustainable energy infrastructure.
Construction begins on Greensand’s carbon dioxide transit terminal at Port Esbjerg
When the tanks are full, the liquefied carbon dioxide will be loaded onto a dedicated carrier from Royal Wagenborg and shipped to the INEOS Nini platform in the Danish North Sea. From there, it will be safely injected via pipeline into subsurface reservoirs approximately 1800 m beneath the seabed for permanent storage.