Sunoco pipeline penalty from PHMSA
Published by Stephanie Roker,
Editor
World Pipelines,
On 2 November, The Pipeline and Hazardous Materials Safety Administration (PHMSA) issued a Notice of Probable Violation, Proposed Compliance Order and Proposed Civil Penalty of US$251 800 to Sunoco Logistics Partners, L.P.
The order came after PHMSA concluded its investigation of a November 2015 accident at the Sunoco-owned West Texas Gulf Pipeline Company's Wortham (Texas) facility that injured several workers.
The NOPV identifies two probable violations of Federal pipeline safety regulations, including failing to have a formal written procedure for the operation and maintenance of the 10 in. flow control valve involved in the accident, and failing to follow a written plan to ensure isolation of all energy sources prior to the start of work on the day the incident occurred.
Read the article online at: https://www.worldpipelines.com/business-news/07112016/sunoco-pipeline-penalty-from-phmsa/
You might also like
World Pipelines Podcast: Going global with IPLOCA
In this episode, Elizabeth Corner speaks to Georges Hage, Executive Secretary at IPLOCA, about IPLOCA's insights on the culture and characteristics of the pipeline contractor community, and how it works to support sustainable energy infrastructure.
Construction begins on Greensand’s carbon dioxide transit terminal at Port Esbjerg
When the tanks are full, the liquefied carbon dioxide will be loaded onto a dedicated carrier from Royal Wagenborg and shipped to the INEOS Nini platform in the Danish North Sea. From there, it will be safely injected via pipeline into subsurface reservoirs approximately 1800 m beneath the seabed for permanent storage.