API and NABTU statement on Atlantic Coast Pipeline
Published by Elizabeth Corner,
Senior Editor
World Pipelines,
American Petroleum Institute (API) President and CEO Mike Sommers and North America’s Building Trades Unions (NABTU) President Sean McGarvey issued the following statement after energy companies cancelled construction of the Atlantic Coast Pipeline after years of unnecessary delays.
“The cancellation of the Atlantic Coast Pipeline sets America back by denying working families and businesses access to affordable and cleaner US natural gas and halting thousands of middle-class sustaining jobs.
“Like too many shovel-ready projects before it, the Atlantic Coast Pipeline faced legal and permitting challenges waged without merit by activists, and these challenges ultimately cost Americans along its route the environmental, employment, and economic benefits that modern pipeline projects bring.”
API represents all segments of America’s oil and natural gas industry. Its more than 600 members produce, process, and distribute most of the nation’s energy. The industry supports 10.9 million US jobs and is backed by a growing grassroots movement of millions of Americans. API was formed in 1919 as a standards-setting organisation. In its first 100 years, API has developed more than 700 standards to enhance operational and environmental safety, efficiency and sustainability.
Read the article online at: https://www.worldpipelines.com/business-news/07072020/api-and-nabtu-statement-on-atlantic-coast-pipeline/
You might also like
World Pipelines Podcast: Going global with IPLOCA
In this episode, Elizabeth Corner speaks to Georges Hage, Executive Secretary at IPLOCA, about IPLOCA's insights on the culture and characteristics of the pipeline contractor community, and how it works to support sustainable energy infrastructure.
Construction begins on Greensand’s carbon dioxide transit terminal at Port Esbjerg
When the tanks are full, the liquefied carbon dioxide will be loaded onto a dedicated carrier from Royal Wagenborg and shipped to the INEOS Nini platform in the Danish North Sea. From there, it will be safely injected via pipeline into subsurface reservoirs approximately 1800 m beneath the seabed for permanent storage.