NuStar announces pipeline capacity expansion project for Albuquerque market
Published by Aimee Knight,
Editorial Assistant
World Pipelines,
NuStar Energy, L.P. has announced a plan to develop incremental pipeline capacity that will allow for the delivery of approximately 6000 bpd of additional refined products, including gasoline, diesel and jet fuel, into the Albuquerque, NM region.
NuStar will upgrade pump stations on a pipeline system it jointly owns with Phillips 66 Partners that transports refined products from Amarillo, Texas to Albuquerque. In addition to increasing capacity on the system, the project will install larger and more efficient electric pumps and a modern, efficient, diesel-driven pump, providing for higher flow while reducing emissions by eliminating two diesel-driven pump stations. The project is expected to be completed by mid-2022.
“The Albuquerque Pipeline upgrades will help ensure ample refined product supply for the market which has lost production due to a recent refinery closure in the state,” said NuStar President and CEO Brad Barron. “Working with Phillips 66 Partners, we are excited that we can provide this additional capacity for our shippers and the region while also achieving the environmental benefits this project provides."
Barron also noted that this project announcement comes on the heels of another project in a neighbouring region that resulted in increased supply for Colorado. In August 2020, NuStar completed the reactivation of an idled pump station on its Colorado Springs Pipeline system. This effectively increased the pipeline’s transportation capacity by approximately 6000 bpd of refined products, including gasoline, diesel and jet fuel into the Colorado Springs and Denver markets, both of which had lost supply due to a recent refinery closure in Wyoming.
Read the latest issue of World Pipelines magazine for pipeline news, project stories, industry insight and technical articles.
World Pipelines’ March 2021 issue
The March 2021 issue of World Pipelines includes: a regional report on pipeline projects in Asia-Pacific; a summary of the latest and best construction equipment courtesy of the annual Heavy Equipment Review; a welding-focused Q&A; and technical articles on hot tapping, sustainable steel and decommissioning.
Read the article online at: https://www.worldpipelines.com/business-news/04032021/nustar-announces-pipeline-capacity-expansion-project-for-albuquerque-market/
You might also like
World Pipelines Podcast: Going global with IPLOCA
In this episode, Elizabeth Corner speaks to Georges Hage, Executive Secretary at IPLOCA, about IPLOCA's insights on the culture and characteristics of the pipeline contractor community, and how it works to support sustainable energy infrastructure.
Construction begins on Greensand’s carbon dioxide transit terminal at Port Esbjerg
When the tanks are full, the liquefied carbon dioxide will be loaded onto a dedicated carrier from Royal Wagenborg and shipped to the INEOS Nini platform in the Danish North Sea. From there, it will be safely injected via pipeline into subsurface reservoirs approximately 1800 m beneath the seabed for permanent storage.