Skip to main content

Fugro receives Pyrenees Phase 3 installation project contract

Published by , Digital Assistant Editor
World Pipelines,


Fugro has received a contract from BHP Billiton Petroleum Pty Ltd for the Pyrenees Phase 3 Installation Project.

The Pyrenees development, which is located offshore Western Australia, is approximately 200 m water depth, 45 km northwest of Exmouth, and is comprised of six separate fields:

  • Stickle
  • Crosby
  • Tanglehead
  • Moondyne
  • Wild Bull
  • Ravensworth

The project includes the tie back of the Stickle 9 well to the existing Tanglehead manifold.

Fugro’s work will include suspension of existing infrastructure, and installation and pre-commissioning of the new flexibles and flying leads. ROV intervention and well commissioning support will be provided and the scope also includes the supply and fabrication of crossings, stabilisation and installation aids, along with mobilisation and transportation of equipment to the field.

Beginning in May 2016, all offshore activities will take place from Fugro’s modern, multi-role construction vessel, the Southern Ocean. The fuel efficient, DP2 vessel is fitted with the required installation spreads to complete the subsea workscope.

All project management, engineering and associated support functions will also be provided by Fugro.

Edited from press release by

Read the article online at: https://www.worldpipelines.com/business-news/04022016/fugro-receives-pyrenees-phase-3-installation-project-contract-521/

You might also like

World Pipelines podcast

The World Pipelines Podcast

Juan Caballero, Chair of the AMPP Board of Directors, talks about AMPP’s global efforts to prevent corrosion and to protect assets, offering insight into how the association listens to its members and serves the pipeline industry.

Listen for free today at www.worldpipelines.com/podcasts or subscribe and review on your favourite podcast app.

Apple Podcasts  Spotify Podcasts  YouTube

 
 
 

Embed article link: (copy the HTML code below):