Subsea 7 awarded contract by Cooper Energy
Published by Anna Nicklin,
Assistant Editor
World Pipelines,
Cooper Energy Ltd has awarded Subsea 7 S.A. a sizeable contract for the Sole development project. The Sole gas field is located in the eastern part of the Gippsland Basin, approximately 40 km offshore Victoria (Australia).
The scope of the contract includes the subsea tie-back of the Sole well to the Orbost gas plant, including the fabrication and installation of 64 km of pipeline, spool and manifold, along with the installation of a 64 km umbilical and the commissioning of the system.
Project management and engineering will commence immediately from Subsea 7’s office in Perth (Australia). While offshore operations are scheduled to commence in 2018, the material offshore operations are subject to the Sole development project’s final investment decision, which is anticipated soon.
Andy Woolgar, Managing Director of Australia and New Zealand at Subsea 7, said: “We are delighted to have been awarded this key project from Cooper Energy Ltd. This award draws upon Subsea 7’s substantial experience of delivering projects in the Gippsland basin over the last 40 years. We look forward to leveraging this established and proven record in pipeline fabrication and offshore installation to help Cooper Energy as it develops its offshore gas resources.”
Read the article online at: https://www.worldpipelines.com/business-news/01032017/subsea-7-awarded-contract-by-cooper-energy/
You might also like
World Pipelines Podcast: Going global with IPLOCA
In this episode, Elizabeth Corner speaks to Georges Hage, Executive Secretary at IPLOCA, about IPLOCA's insights on the culture and characteristics of the pipeline contractor community, and how it works to support sustainable energy infrastructure.
Construction begins on Greensand’s carbon dioxide transit terminal at Port Esbjerg
When the tanks are full, the liquefied carbon dioxide will be loaded onto a dedicated carrier from Royal Wagenborg and shipped to the INEOS Nini platform in the Danish North Sea. From there, it will be safely injected via pipeline into subsurface reservoirs approximately 1800 m beneath the seabed for permanent storage.