Watch this webinar
About this webinar
There are many reasons for re-routing or removing a section of pressurised pipeline, this can be due to city expansion where highly critical pipelines are relocated away from densely populated areas or at river crossings where buried pipelines have become damaged due to riverbed movement. Additionally, as pipelines reach the end of their design life they are required to be replaced or decommissioned.
As global demand for energy increases so do the consequences of any potential pipeline outage. Interference to this flow can have major consequences both commercially for the operator and more critically a potential shortfall in fuel supply to the client.
In cases where pipelines are required to be re-routed, without suitable double block isolation tools installed, it will be necessary to depressurise the entire section of pipeline to allow safe re-routing of the new section.

STATS Group
STATS Group are market leaders in the supply of pressurised pipeline isolation, hot tapping and plugging services to the global oil, gas and petrochemical industries. STATS DNV GL type approved isolation tools provide leak-tight double block and bleed isolation that enables safe and efficient maintenance and repair of onshore, topsides and subsea pipeline infrastructure.
Their Process Plant Solutions offer hot-work barriers and localised hydrostatic test tools to verifying the integrity of welds or fittings, reducing system downtime, minimising environmental impact and increasing worksite safety. Mechanical pipe connectors replace the need for welding, significantly reducing expenditure and associated risks with hot-work.